EVALUATION OF FACTOR AFFECTING FOR LABOUR PRODUCTIVITY IN CONSTRUCTION PROJECT BY AHP
DOI:
https://doi.org/10.53555/eijse.v1i1.26Keywords:
Analytical hierarchy process, labour productivity, stake holdersAbstract
The study aims at identifying the factors an affecting labor productivity of Building construction projects in the South Gujarat. . To do so, as per sample size 350 Stakeholders working in construction completed a structured questionnaire survey ranked the identified factors according to analytical hierarchy process. 40 factors were identified through a detailed literature review. Factors of similar nature were grouped together; giving rise to seven main groups that are: technical, labor, materials, equipments, external &environmental, safety and quality. The analysis of the identified factors indicated that the top ten important factors negatively aecting labor productivity of building construction projects in South Gujarat are: quality inspection delay, working at high places, rework, low quality raw material, lack of material, delay in arrival of material, equipment shortage, lack of labour skill, payment delay
References
. Adnan Enshassi, Peter Eduard Mayer, Sherif Mohamed, Ziad Abu Mustafa (2007) “ Factors affecting labour productivity in building projects in the gaza strip. “Journal of Civil Engineering and Management. 2007, 13(4); 245-254.
. Abdul Kadir, M. R., Lee, w. P., Jaafar, M. S., Sapuan, S. M., AndAli, A.A. (2005). “Factors Affecting Construction Labour Productivity for Malaysian Residential Projects.” Struct. Surv, 23 (1), 42–54.
. ASCE M, William Ibbs (2005) “Impact of change‟ s timing on labour Productivity. “Journal of Construction Engineering and Management, 2005, 131(11), 1219-1223
. Aynor Kazaz, Ekrem Manisali, Serdar Ulubeyli (2008) “Effect of basic motivational factors on construction workforce productivity in turkey.” Journal of Civil Engineering and Management.2008, 14(2); 95-106.
. Agapiou,A., Flanagan, R., Norman, G., and Notman, D. "The Change Role of Builders’ Merchants in the Construction Supply Chain" Construction Management and Economics, Vol.16, 1998, pp351-361.
. Bengt Hansson, Henry MwanakiAlinaitwe, Jackson A. Mwakali (2007) “Factors affecting the productivity of building craftsmen- Studies of Uganda.” Journal of Civil Engineering and Management. 2007, 13; 169-176.
. Ibrahim Mahamid, A.Al - Ghonamy, M. Aichouni “Major Factors Influencing Employee Productivity in the KSA Public Construction Projects” IJCEE-IJENS Vol: 14 No: 01.
. Khaled M. EI-Gohary, Mostafa E. Shehata (2011) “Towards improving construction labour productivity and projects performance.” Alexandria Engineering Journal. 2011, 50; 321-330.
. Shashank K, Dr. Sutapa Hazra, Kabindra Nath Pal “Analysis of Key Factors Affecting the Variation of Labour Productivity in Construction Projects” ISSN 2250-2459, ISO 9001:2008 Certified Journal, Volume 4, Issue 5, May 2014
. Mistry Soham, Bhatt Rajiv “Critical Factors Affecting Labour Productivity In Construction Projects: Case Study Of South Gujarat Region Of India” IJEAT ISSN: 2249 – 8958, Volume-2, Issue-4, April 2013
. Sisalem E., Aboubad K., and Hamad M., 2000 Engineering management "value added assessment of construction". (Graduation project), Islamic university - Gaza (unpublished).
. Teicholz Paul, 2001. U.S. construction labor productivity trends, 1970-1998. Journal of Construction Management and Engineering, ASCE, vol.127, issue 5, pp. 427-429.
Downloads
Published
Issue
Section
License
Copyright (c) 2015 EPH - International Journal of Science And Engineering (ISSN: 2454 - 2016)
This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.